PRESS

Video: Monroe Fish Passage Testing

December 9, 2020

An overview of fish passage tests conducted with PNNL at our hydropower plant in Monroe, Oregon in the fall of 2020.

Turbine: 190cm diameter RHT at 5m head, 130 rpm
Quantity: 60 treatment, 59 control releases
Species: Rainbow trout, 200-400 mm length
Results: 100% immediate and 48h survival of turbine-passed fish

For more information on our fish passage testing, please visit https://www.natelenergy.com/fish-passage.

More Stories

Video

Gia Schneider chats with Elena Casas from Reuters about sustainable hydropower on The Switch

Watch Gia's chat with Elena Casas on Reuters's The Switch. They discuss climate change, learning from beavers, and the future of sustainable hydropower.

Awards

Principal Engineer Sterling Watson wins NHA's Rising Star Award

Principal Engineer Sterling Watson won this year's inaugural Rising Star Award, presented by the National Hydropower Association's Future Leaders of Waterpower group.

Podcasts

Hydro As Part of the Energy Transition

Gia talks to Amy Pempel, host of the Siemens Energy podcast, about hydro's great potential to become more sustainable and expand its reach.