From Ziroth: Natel Energy recently announced a partnership with Symbion power called MyHydro. The aim is to deploy their new restoration hydro turbine throughout the Democratic Republic of Congo. This video looks at how it works and what it means for the clean energy sector.
This video describes the RHT as a "micro" turbine, but Natel is actively moving toward large-size installations. The DRC installations will be small, but not micro turbines.
Gia discusses FIshSafe turbine designs as the best available technology for existing hydro plant refurbishments and upgrades and for powering non-powered dams.