Gia talks about retrofitting existing hydro units, adding generation to non-powered dams, and installing the RHT in Africa in collaboration with MyHydro on POWER Magazine's podcast.
https://www.powermag.com/fish-friendly-hydro-natel-energy-is-proving-its-possible/
Natel Energy is recognized for the creation of a first-of-its kind fish passage test lab, designed and built at the hydropower company’s Alameda, CA headquarters.